CZ has four buildings in Tilburg that are connected by a footbridge over Abeelstraat. In collaboration with Unica Oosterhout, we started at building A and B in 2020, to which buildings C and D were added in 2022. We find district heating, heat pumps and cooling installations across these buildings. Together with Unica, we are improving the climate system, optimising energy use and ensuring good comfort.