Skip to main content

We have saved 23.245 Tons of COover the past 12 months!

Hager The Netherlands

VB Validate

Validation of installations after completion. Insights that proved to be particularly useful during the handover of the building.


For the new construction of Hager's Dutch head office in Den Bosch, a validation was carried out. A Digital Twin was created and connected to the Priva building management system. This visualised the functioning of the various installations, the hydraulic balance and the available capacities, on the basis of which the installer made the necessary adjustments. The Digital Twin remains connected and the installation is now being monitored.